A coke pit in a refinery’s delayed coking unit had shown signs of deterioration on the pit walls and its integrated maze structure. In addition to corrosion due to chemicals, the walls were cracking and deteriorating due to the impact of front-end loaders.
SIMCO Technologies and STRUCTURAL were selected to design and install a precast wall system and perform repairs. The improvements were completed in two phases using a precast system.
For the precast wall system, the projects began with demolition of the deteriorated sections of the existing wall. A leveling curb was formed and dowelled into place, creating a place for the new precast wall sections to rest upon. The precast wall panels were custom engineered and manufactured offsite prior to the turnarounds which significantly reduced installation time. The solutions was designed to improve the long-term durability and impact resistance of the walls.
General repairs were also made to the coke maze (fines settling pit). Various sections of the maze walls were either raised or lowered to allow a path for optimal water flow and settling of the fine coke particles. Custom-designed protective steel Glancing Plates were then installed to act as a barrier from topside crane impact.
Repairs were made during scheduled turnarounds.
Engineer: SIMCO Technologies
Contractor: STRUCTURAL